by Brendan Kennedy | Oct 29, 2024
Phase One Schedule: Base Bid: Install new electrical power to the existing mechanical building and lift station. Base Bid: Install new domestic water through existing Senior Services Building and reconnect water to adjacent buildings (Farmer’s Market, Plant Clinic,...
by Brendan Kennedy | Aug 26, 2024
by Brendan Kennedy | Jun 4, 2024
by Brendan Kennedy | Mar 26, 2024
by Brendan Kennedy | Feb 27, 2024
This project constructs a Boat Maintenance and Storage Facility, RR456, that will consist of a singlestory,18,000 total gross square foot, boat and engine repair and storage building. The building will consist of a pre-engineered metal building (PEMB) with reinforced...